{"id":19548,"date":"2020-03-19T11:26:33","date_gmt":"2020-03-19T11:26:33","guid":{"rendered":"https:\/\/brm.ro\/piata-la-disponibil-ringul-materialelor-de-constructii\/"},"modified":"2026-05-21T14:31:23","modified_gmt":"2026-05-21T12:31:23","slug":"piata-la-disponibil-ringul-materialelor-de-constructii","status":"publish","type":"page","link":"https:\/\/brm.ro\/en\/piata-la-disponibil-ringul-materialelor-de-constructii\/","title":{"rendered":"Retail Market \u2013 Construction Materials Ring"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row css_animation=&#8221;&#8221; row_type=&#8221;row&#8221; use_row_as_full_screen_section=&#8221;no&#8221; type=&#8221;grid&#8221; angled_section=&#8221;no&#8221; text_align=&#8221;left&#8221; background_image_as_pattern=&#8221;without_pattern&#8221; padding_top=&#8221;70&#8243; padding_bottom=&#8221;70&#8243; z_index=&#8221;&#8221; css=&#8221;.vc_custom_1582150087506{background-color: #ffffff !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_column_text]In the Construction Materials Ring, purchase or sale auctions are conducted for the listed products used both in road construction (roads, bridges) and in civil works (civil and industrial buildings) or special-purpose works (dams, constructions intended for communications systems, etc.).<\/p>\n<p>Among the underlying assets commonly traded are:<\/p>\n<p>Materials for road construction: bitumen, bituminous emulsions, asphalt mixes, aggregates from ballast pits and quarries (sand, gravel, ballast and others), crushed stone, chippings, road marking paint, etc.<\/p>\n<p>Materials for general construction: cement, concrete, bricks, mortars, screeds, interior or exterior paints, floor tiles, wall tiles, etc.[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text]<strong>The main advantages resulting from accessing the Construction Materials Ring within the Retail Market (Spot) refer to:<\/strong>[\/vc_column_text]<div class=\"q_list circle\">\n\t<\/p>\n<ul>\n<li><strong>Competitive price<\/strong> \u2013 obtained in an organized framework, as a result of the direct interaction between supply and demand. Using the price negotiation mechanism within the open-outcry auction or the electronic auction provides the possibility for bidders to further improve prices compared to their initial financial offers. If the prices obtained do not fall within the proposed cap, there is the possibility to negotiate their reduction with the bidder ranked first within the same session, without the need to restart the entire procedure;  <\/li>\n<li><strong>Shorter timeframe for conducting procedures<\/strong> \u2013 the order is scheduled for trading within a maximum of 7 days from the date of issuance;<\/li>\n<li><strong>BRM quotations<\/strong> \u2013 provide the advantage of a <strong>reference system<\/strong> for benchmarking against market prices in transactions carried out through BRM;<\/li>\n<li><strong>Exchange Guarantee System<\/strong> \u2013 proper performance of the contract based on this <strong>system <\/strong>used, as well as as a result of the careful selection of bidders before they are admitted to trading;<\/li>\n<li><strong>Large number of bidders<\/strong>, due to the significant quantities traded at the overall market level;<\/li>\n<li><strong>Time and<\/strong> <strong>additional<\/strong> effort savings related to the sale or purchase of products;<\/li>\n<li><strong>Elimination of bureaucracy<\/strong> related to traditional public procurement procedures by standardizing commodities and reducing the number of required and submitted documents.<\/li>\n<\/ul>\n<p><\/div>[\/vc_column][\/vc_row][vc_row css_animation=&#8221;&#8221; row_type=&#8221;row&#8221; use_row_as_full_screen_section=&#8221;no&#8221; type=&#8221;grid&#8221; angled_section=&#8221;no&#8221; text_align=&#8221;left&#8221; background_image_as_pattern=&#8221;without_pattern&#8221; padding_top=&#8221;70&#8243; padding_bottom=&#8221;70&#8243; z_index=&#8221;&#8221; css=&#8221;.vc_custom_1582278363609{background-color: #f3f3f3 !important;}&#8221;][vc_column][vc_tabs style=&#8221;boxed&#8221;][vc_tab title=&#8221;DOCUMENTS&#8221; tab_id=&#8221;8a75d1c2-2822-10&#8243;][vc_row_inner row_type=&#8221;row&#8221; type=&#8221;full_width&#8221; text_align=&#8221;left&#8221; css_animation=&#8221;&#8221;][vc_column_inner width=&#8221;1\/2&#8243;][vc_column_text]<\/p>\n<ul>\n<li><a href=\"https:\/\/brm.ro\/wp-content\/uploads\/Model-Ordin-initiator-cumparare-materiale-de-constructii-BRM-2020.doc\">Template \u2013 Initiating Order for the Purchase of Construction Materials, BRM 2020<\/a><\/li>\n<li><a href=\"https:\/\/brm.ro\/wp-content\/uploads\/Ordin-de-Sens-Contrar.doc\">Opposite-Side Order<\/a><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][\/vc_tab][vc_tab title=&#8221;CONSTRUCTION MATERIALS TRADING PROCEDURE&#8221; tab_id=&#8221;1582271115009-1-6&#8243;][vc_row_inner row_type=&#8221;row&#8221; type=&#8221;full_width&#8221; text_align=&#8221;left&#8221; css_animation=&#8221;&#8221;][vc_column_inner][vc_column_text]<\/p>\n<ul>\n<li><a href=\"https:\/\/brm.ro\/wp-content\/uploads\/Procedura-de-Tranzactionare-Materiale-de-Constructii-R-15_14.09.2021.doc\">Construction Materials Trading Procedure R 15_14.09.2021<\/a><\/li>\n<li><a href=\"https:\/\/brm.ro\/wp-content\/uploads\/Formular-Garantie-Bursiera-SGB-1.docx\">Form \u2013 Exchange Guarantee (SGB)<\/a><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][\/vc_tab][vc_tab title=&#8221;STAGES OF THE PROCEDURE&#8221; tab_id=&#8221;1582272970306-2-6&#8243;]<div class=\"qode-accordion-holder clearfix qode-accordion qode-initial \">\n\t<h4 class=\"clearfix qode-title-holder\">\n<span class=\"qode-tab-title\">\n\t    <span class=\"qode-tab-title-inner\">\n        Access and trading methods on the Retail Market (Spot) \u2013 Construction Materials Ring    <\/span>\n<\/span>\n<span class=\"qode-accordion-mark\">\n    <span class=\"qode-accordion-mark-icon\">\n        <span class=\"icon_plus\"><\/span>\n        <span class=\"icon_minus-06\"><\/span>\n    <\/span>\n<\/span>\n<\/h4>\n<div  class=\"qode-accordion-content \" >\n    <div class=\"qode-accordion-content-inner\">\n        [vc_column_text]<\/p>\n<h4><strong>1. Complete the Initiating Order<\/strong>, according to your situation and specifications.<\/h4>\n<h4>ATTENTION!<\/h4>\n<p>In the Construction Materials Ring, bidding is conducted on the product\u2019s unit price, including transport but excluding VAT. In procurement\/sale procedures for multiple products for which a single auction is organized, bidding will be conducted on the total contract price, also including transport but excluding VAT.[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4><strong>2. Agree with the Construction Materials Ring Manager on the procedure schedule.<\/strong><\/h4>\n<p>Your trading session (auction) will take place on the BRM electronic trading platform. It will be scheduled within a maximum of 7 calendar days from the date of publication of your Initiating Order. To postpone this deadline for a period between a minimum of 4 days and a maximum of 15 working days, please submit a written request to the ring manager.[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<\/p>\n<h4><strong>3. Submit the Initiating Order to BRM together with the Award Documentation.<\/strong><\/h4>\n<p>It is recommended that the Award Documentation include:<\/p>\n<ul>\n<li>Terms of Reference \u2013 your technical conditions and specifications for fuel supply in the future supply contract.\n<ul>\n<li>Annexes with delivery locations or the radius within which bidders must have warehouses for product delivery<\/li>\n<\/ul>\n<\/li>\n<li>Supply Contract (draft) \u2013 your conditions and specifications from a legal and economic perspective. <\/li>\n<li>Participation Forms \u2013 to be completed by any potential bidder<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<\/p>\n<div class=\"wpb_text_column wpb_content_element \">\n<div class=\"wpb_wrapper\">\n<h4><strong>4. BRM publishes your Initiating Order and sends the Invitations to Participate. <\/strong><\/h4>\n<p>If you submit the Initiating Order and the Award Documentation by 16:00, the procedure will be published the same day.<\/p>\n<p>If you submit the documents after 16:00, the procedure will be published the next day. For this reason, the procedure schedule may be subject to changes. Full responsibility for any changes to the procedure schedule lies exclusively with the ordering customer.  <\/p>\n<\/div>\n<\/div>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<\/p>\n<h4><strong>5. Publicity period<\/strong><\/h4>\n<p>Between the publication date of the procedure and the Deadline for Submission of Offers, any potential bidder may submit requests for clarification and\/or amendments to the Award Documentation, to the addresses and within the deadlines specified in the Initiating Order. Full responsibility for drafting and sending responses to clarification requests regarding the Award Documentation lies exclusively with the ordering customer.[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<\/p>\n<h4><strong>6. Registration of bidders for the procedure and submission of offers<\/strong><\/h4>\n<p>Any potential bidder must submit the requested documents by the deadline specified as the Deadline for Submission of Offers, as follows:<\/p>\n<ul>\n<li>Opposite Direction Order \u2013 to the ring manager<\/li>\n<li>Proof of Exchange Guarantee constitution \u2013 to the ring manager<\/li>\n<li>Bid Documentation (documents requested by the initiating client) \u2013 to the initiating client&#8217;s addresses<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<\/p>\n<h4><strong>7. Evaluation and qualification\/rejection<\/strong> <strong>of offers<\/strong><\/h4>\n<p>The evaluation of the documents requested through the Award Documentation (pursuant to Law 98 or 99\/2016) within the submitted offers, as well as their qualification or, as applicable, rejection from the price trading stage, is carried out by the evaluation committee of the customer initiating the procedure. Full responsibility for qualifying or rejecting the received offers lies exclusively with the ordering customer.[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4><strong>8. Electronic Trading Session<\/strong><\/h4>\n<p>It is divided into 3 stages, as follows:<\/p>\n<ul>\n<li>Stage I: Opening of the Session \u2013 Bidders enter starting prices \u2013 Approximate duration: 15 minutes<\/li>\n<li>Stage II: Free Trades \u2013 Bidders improve the prices entered in Stage I \u2013 Approximate duration: 15 minutes\n<ul>\n<li>The prices of the bidders and of the initiating customer are visible to all participants throughout the session<\/li>\n<li>The initiating customer\u2019s price may be challenged by any bidder, thereby launching the trade. Execution time: 2 minutes <\/li>\n<li>The price of the bidder who launched a trade may be counter-challenged by any other bidder. Counter-challenge time: max. 2 minutes <\/li>\n<li>If the order that launched a trade is not counter-challenged within 2 minutes of launch, the trade is executed and can no longer be challenged.<\/li>\n<\/ul>\n<\/li>\n<li>Stage III: Closing of the Session \u2013 Bidders can no longer modify prices. The Initiating Customer accepts\/rejects the best price. <\/li>\n<\/ul>\n<p>Attention! If operational malfunctions occur during Phases 1 and 2, immediately take a screenshot (not a phone photo) of the error message from the application menu and send it immediately to the ring manager you are working with. Then contact your point of contact, either at BRM or at your assigned terminal. Complaints not accompanied by the supporting screenshot will not be considered![\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<\/p>\n<h4><strong>9. Completion of the procedure. Documents issued following the trading session <\/strong><\/h4>\n<ul>\n<li>Trading session report \u2013 signed by all participants in the respective procedure:\n<ul>\n<li>The Initiating Customer<\/li>\n<li>Bidding Customers<\/li>\n<li>Session coordinator<\/li>\n<\/ul>\n<\/li>\n<li>Exchange Contract (for sessions concluded with award) \u2013 signed by:\n<ul>\n<li>The Initiating Customer<\/li>\n<li>The Customer Winning the Auction<\/li>\n<li>Session coordinator<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<\/p>\n<h4><strong>10. Completion of the procedure. Return of guarantees. Payment of the BRM commission  <\/strong><\/h4>\n<ul>\n<li>Complete a <strong><a href=\"https:\/\/brm.ro\/wp-content\/uploads\/Model-Cerere-de-Restituire-Garantie.doc\">Guarantee Refund Request<\/a><\/strong> and submit it to the ring manager.<\/li>\n<li>If the company you represent is a party to the executed transaction, pay the BRM commission into the account specified on the invoice you receive after signing the Exchange Contract.<\/li>\n<li>If you posted the guarantee via Payment Order, you may also pay the amount on the commission invoice by offsetting it against the amount transferred to the guarantee account. In this case, request the Mutual Debt Settlement Agreement from the ring manager. The difference will be transferred back by BRM to the account specified by you.  <\/li>\n<li>If the company you represent is not a party to the recorded transaction and has no outstanding debts to BRM, BRM will transfer the amount back to the account specified by you, within the timeframe specified in the Guarantee Refund Request.<\/li>\n<\/ul>\n<p>[\/vc_column_text]    <\/div>\n<\/div><\/div>[\/vc_tab][\/vc_tabs][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row css_animation=&#8221;&#8221; row_type=&#8221;row&#8221; use_row_as_full_screen_section=&#8221;no&#8221; type=&#8221;grid&#8221; angled_section=&#8221;no&#8221; text_align=&#8221;left&#8221; background_image_as_pattern=&#8221;without_pattern&#8221; padding_top=&#8221;70&#8243; padding_bottom=&#8221;70&#8243; z_index=&#8221;&#8221; css=&#8221;.vc_custom_1582150087506{background-color: #ffffff !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_column_text]In the Construction Materials Ring, purchase or sale auctions are conducted for the listed products used both in road construction (roads, bridges) and in civil works (civil and industrial buildings) or&#8230;<\/p>\n","protected":false},"author":5,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"full_width.php","meta":{"footnotes":""},"class_list":["post-19548","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/pages\/19548","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/comments?post=19548"}],"version-history":[{"count":6,"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/pages\/19548\/revisions"}],"predecessor-version":[{"id":20355,"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/pages\/19548\/revisions\/20355"}],"wp:attachment":[{"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/media?parent=19548"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}