{"id":19330,"date":"2020-06-30T09:30:32","date_gmt":"2020-06-30T09:30:32","guid":{"rendered":"https:\/\/brm.ro\/retail-market-construction-materials\/"},"modified":"2020-06-30T09:30:32","modified_gmt":"2020-06-30T09:30:32","slug":"retail-market-construction-materials","status":"publish","type":"page","link":"https:\/\/brm.ro\/en\/retail-market-construction-materials\/","title":{"rendered":"Retail Market &#8211; Construction Materials"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row css_animation=&#8221;&#8221; row_type=&#8221;row&#8221; use_row_as_full_screen_section=&#8221;no&#8221; type=&#8221;grid&#8221; angled_section=&#8221;no&#8221; text_align=&#8221;left&#8221; background_image_as_pattern=&#8221;without_pattern&#8221; padding_top=&#8221;70&#8243; padding_bottom=&#8221;70&#8243; z_index=&#8221;&#8221; css=&#8221;.vc_custom_1582150087506{background-color: #ffffff !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_column_text]Withing the Construction material trading floor, buying and selling auctions take place for fungible products used for road constructions (roads, bridges) as well as civil constructions (Civil buildings, industrial buildings) or characterised constructions ( dams, communication system buildings, etc.)<\/p>\n<p>Among the available products you can find:<\/p>\n<p>General construction materials: concrete, asphaltic plug-joints, bitumen and bituminous emulsions, different aggregates like sands, gravels, chippings or sieve oversizes, cement, bricks &amp; other materials for various building sites.[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text]<strong>The main advantages resulted from accessing the Construction Materials section of the Retail market refer to:<\/strong>[\/vc_column_text]<div class=\"q_list circle\">\n\t<\/p>\n<ul>\n<li><strong>Advantageous price<\/strong>&#8211; Resulted from an organised system as a direct product of supply and demand. Using the price negotiation within the live or electronic auction offers the possibility of further price improvement compared to the initial best offered price. If the obtained price does not fall between your highest accepted price, the possibility of negotiating with only the best price bidder exists within the trading session, without having to repeat the procedure;<\/li>\n<li><strong>Reduced amount of time for procedure completion<\/strong>&#8211; The order is scheduled for trade within maximum 7 days from the date of issue;<\/li>\n<li><strong>RCE quotes<\/strong>&#8211; These offer the advantage of a reference system with regards to the prices within the market available through RCE;<\/li>\n<li><strong>The exchange guarantee system-\u00a0<\/strong>executing the contract in good conditions using the utilised <strong>system\u00a0<\/strong>as well as careful bidder selection before admission to the trading sessions.<\/li>\n<li><strong>Large number of existent bidders<\/strong> due to the large quantities traded at the total market level;<\/li>\n<li><strong>Efficient time and effort management\u00a0<\/strong>related to the capitalization or acquisition of products;<\/li>\n<li><strong>Elimination of bureaucracy<\/strong> related to classic public acquisitions through commodity standardization and reduction of the amount of needed documents.<\/li>\n<li><\/li>\n<\/ul>\n<p><\/div>[\/vc_column][\/vc_row][vc_row css_animation=&#8221;&#8221; row_type=&#8221;row&#8221; use_row_as_full_screen_section=&#8221;no&#8221; type=&#8221;grid&#8221; angled_section=&#8221;no&#8221; text_align=&#8221;left&#8221; background_image_as_pattern=&#8221;without_pattern&#8221; padding_top=&#8221;70&#8243; padding_bottom=&#8221;70&#8243; z_index=&#8221;&#8221; css=&#8221;.vc_custom_1582278363609{background-color: #f3f3f3 !important;}&#8221;][vc_column][vc_tabs style=&#8221;boxed&#8221;][vc_tab title=&#8221;DOCUMENTE&#8221; tab_id=&#8221;8a75d1c2-2822-10&#8243;][vc_row_inner row_type=&#8221;row&#8221; type=&#8221;full_width&#8221; text_align=&#8221;left&#8221; css_animation=&#8221;&#8221;][vc_column_inner width=&#8221;1\/2&#8243;][vc_column_text]<\/p>\n<ul>\n<li><a href=\"https:\/\/brm.ro\/wp-content\/uploads\/Model-Ordin-initiator-cumparare-materiale-de-constructii-BRM-2020.doc\">Model &#8211; Ordin initiator cumparare materiale de constructii BRM 2020<\/a><\/li>\n<li><a href=\"https:\/\/brm.ro\/wp-content\/uploads\/Ordin-de-Sens-Contrar.doc\">Ordin de Sens Contrar<\/a><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][\/vc_tab][vc_tab title=&#8221;PROCEDURA DE TRANZAC\u021aIONARE MATERIALE DE CONSTRUC\u021aII&#8221; tab_id=&#8221;1582271115009-1-6&#8243;][vc_row_inner row_type=&#8221;row&#8221; type=&#8221;full_width&#8221; text_align=&#8221;left&#8221; css_animation=&#8221;&#8221;][vc_column_inner][vc_column_text]<\/p>\n<ul>\n<li><a href=\"https:\/\/brm.ro\/wp-content\/uploads\/2020\/06\/Procedura-de-Tranzactionare-Materiale-de-Constructii-R-14.doc\">Procedura de Tranzactionare Materiale de Constructii R 14<\/a><\/li>\n<li><a href=\"https:\/\/brm.ro\/wp-content\/uploads\/2020\/06\/Formular-Garantie-de-Participare-SGB.docx\">Formular &#8211; Garantie de Participare (SGB)<\/a><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][\/vc_tab][vc_tab title=&#8221;ETAPELE DESF\u0102\u0218UR\u0102RII PROCEDURII&#8221; tab_id=&#8221;1582272970306-2-6&#8243;]<div class=\"qode-accordion-holder clearfix qode-accordion qode-initial \">\n\t<h4 class=\"clearfix qode-title-holder\">\n<span class=\"qode-tab-title\">\n\t    <span class=\"qode-tab-title-inner\">\n        Acces \u0219i modalit\u0103\u021bi de tranzac\u021bionare pe Pia\u021ba Retail (Disponibil) \u2013 Ringul Materialelor de Construc\u021bii    <\/span>\n<\/span>\n<span class=\"qode-accordion-mark\">\n    <span class=\"qode-accordion-mark-icon\">\n        <span class=\"icon_plus\"><\/span>\n        <span class=\"icon_minus-06\"><\/span>\n    <\/span>\n<\/span>\n<\/h4>\n<div  class=\"qode-accordion-content \" >\n    <div class=\"qode-accordion-content-inner\">\n        [vc_column_text]<strong>1.Complete the Initiating Order according to your specifications.<\/strong><\/p>\n<h4>ATTENTION!<\/h4>\n<p>Within the Construction material trading floor, the bid price contains the price of the goods including transport but VAT exclusive! For instances where more than one type of good is traded, the price of the whole contract will be offered with included transport but VAT exclusive![\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<strong>2. Schedule the date of the trading session with the Trading floor manager or with the director of the Terminal of which you belong to.<\/strong><\/p>\n<p>Your trading session (auction) will only take place on RCE\u2019s electronic trading platform. It will be scheduled in a maximum of 7 calendaristic days from the date of your Initiating Order issue date. In order to schedule the session earlier (4 days minimum) or reschedule ( later than 8 days) please send a written request to the Retail market Natural Gas manager or to the RCE Terminal which has organised the procedure.[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<strong>3. Provide RCE with the Initiating Order together with the Award documentation.<\/strong><\/p>\n<p>It is recommended that the Award documentation shall contain:<\/p>\n<ul>\n<li>The task specification \u2013 your conditions and technical specifications for the supply of Construction material in your future supply contract.<\/li>\n<li>\u00a0 Annex containing your delivery area or the radius where bidders must own deposits for the delivery of the goods.<\/li>\n<li>\u00a0Draft supply contract- your conditions and specifications from a legislative and economic point of view.<\/li>\n<li>\u00a0Participantion form- To be completed by all potential bidders.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<\/p>\n<div class=\"wpb_text_column wpb_content_element \">\n<div class=\"wpb_wrapper\">\n<p><strong>4. RCE publishes your Initiating Order and sens the Participation invitation.<\/strong><\/p>\n<p>If the Initiating Order and Award documentation was sent before 16:00, the procedure will be published in the same day.<\/p>\n<p>If the documentation has been sent after 16:00, the procedure will be published the following day. Due to this, the procedure calendar can suffer changes. All responsibility related to changes to the procedure date falls exclusively to the Initiating customer.<\/p>\n<\/div>\n<\/div>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<strong>5. Advertising period<\/strong><\/p>\n<p>Between the date of the procedure publication and the limit date for providing the offers, any potential bidder can send clarification requests and\/or document modification requests, to the addresses mentioned but within the time limit mentioned in the Initiating order. The responsibility of answering the requests and clarification of the Award documentation falls to the initiating customer.[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<strong>6.Bidder registration for the procedure and providing the offers<\/strong><\/p>\n<p>Any potential bidder must provide requested documentation within the mentioned time limit, like so:<\/p>\n<ul>\n<li>\u00a0Opposite order- To the Trading floor manager and the organising RCE terminal<\/li>\n<li>\u00a0Proof of guarantee constitution- To the Trading floor manager and to the organising terminal<\/li>\n<li>Award documentation (requested by the initiating customer)\u00a0 \u2013 To the Trading floor\u00a0 manager and to the organising terminal<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<strong>7. Evaluating and qualifying\/rejecting offers<\/strong><\/p>\n<p>Documentation\u00a0 requested through the Award documentation evaluation (According to Law 98 and\/or 99\/2016) within the opposite offers as well as qualification or rejection of offers in the price trading stage of the session is realized by the evaluation committee. All responsibility of qualifying or rejecting received offers falls exclusively to the Initiating client.[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<strong>8. Electronic trading session<\/strong><\/p>\n<p>Split into 3 stages like so:<\/p>\n<ul>\n<li>\u00a0Stage I: Opening stage- Bidders introduce their starting price- Duration: 15 minutes<\/li>\n<li>\u00a0Stage II: Free trade- Bidders improve the pries introduced in stage I\u00a0 \u2013 Duration: 15 minutes<\/li>\n<\/ul>\n<p>Bidder prices and the initating customers prices are visible to all participants during the session.<\/p>\n<p>The Initiating clients price can be matched by any bidder, thus launching the trade. The execution time is 2 minutes.<\/p>\n<p>The price of the bidder which launched a transaction can be improved by any another bidder. The execution time is 2 minutes.<\/p>\n<p>If the matched order is not improved for 2 minutes, the transaction is successfully concluded.<\/p>\n<ul>\n<li>\u00a0\u00a0\u00a0 Stage III: Session close\u2013 Bidders can not modify their prices. The initiator accepts or refuses the best price.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<strong>9. Procedure finalising. Documents issues post trading session.<\/strong><\/p>\n<ul>\n<li>Trading session report-this is signed by all participants to the procedure:<\/li>\n<\/ul>\n<p>Initiating client<\/p>\n<p>Bidding clients<\/p>\n<p>Session coordinator<\/p>\n<ul>\n<li>\u00a0\u00a0\u00a0 Session contract (For sessions with a successfull transaction) \u2013 signed by:<\/li>\n<\/ul>\n<p>Initiating customer<\/p>\n<p>Winning bidder of the transaction<\/p>\n<p>Session coordinator[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][vc_column_text]<\/p>\n<h4>10. Procedure closing. Guarantee clearing. RCE commission payment<\/h4>\n<ul>\n<li>\u00a0Complete a Guarantee restitution request and send it to the RCE manager.<\/li>\n<li>\u00a0If the organisation you represent is part of the concluded transaction, pay the RCE commission in the account specified on the invoice.<\/li>\n<li>If your guarantee was constituted through a money order, you can pay the value of the commission through compensation in the guarantee account. Request the reciprocal debt clearance to the RCE manager. The difference will be provided back to you by RCE in the account specified.<\/li>\n<li>If your organisation was not part in the transaction and has no debts to clear with RCE, RCE will pay back the amount in the account specified by you by the time specified in the guarantee restitution request.<\/li>\n<\/ul>\n<p>[\/vc_column_text]    <\/div>\n<\/div><\/div>[\/vc_tab][\/vc_tabs][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row css_animation=&#8221;&#8221; row_type=&#8221;row&#8221; use_row_as_full_screen_section=&#8221;no&#8221; type=&#8221;grid&#8221; angled_section=&#8221;no&#8221; text_align=&#8221;left&#8221; background_image_as_pattern=&#8221;without_pattern&#8221; padding_top=&#8221;70&#8243; padding_bottom=&#8221;70&#8243; z_index=&#8221;&#8221; css=&#8221;.vc_custom_1582150087506{background-color: #ffffff !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_column_text]Withing the Construction material trading floor, buying and selling auctions take place for fungible products used for road constructions (roads, bridges) as well as civil constructions (Civil buildings, industrial buildings) or&#8230;<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"full_width.php","meta":{"footnotes":""},"class_list":["post-19330","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/pages\/19330","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/comments?post=19330"}],"version-history":[{"count":0,"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/pages\/19330\/revisions"}],"wp:attachment":[{"href":"https:\/\/brm.ro\/en\/wp-json\/wp\/v2\/media?parent=19330"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}